A 95 Bedroom student accommodation building, installed in a repurposed existing building, previous designed as a hotel.

Project duration:

Project Value: £1 Million

As the main M&E contractor on this project Eurolec was responsible for:

  • M&E design, calculations and construction drawings.

  • Small Power Installation.

  • Lighting design & installation.

  • Fire detection installation.

  • Drainage Installation.

  • Ventilation design & installation

  • Security and CCTV installation.

  • Heating installation.

  • Design and installation of new commercial boiler and pump set. 

  • Updating and renovating the building management system (BMS).

MagdalenStreet.jpg
Magdalen Street 

Magdalen Street - Colchester

A new accommodation block housing 250 study rooms over 3 blocks, as well as studio accommodation, cluster kitchens and communal areas.

 

Project duration:

Project Value: £3 Million

As the main M&E contractor on this project, Eurolec Services was responsible for:

  • M&E Design, calculations and construction drawings.

  • Small Power installation.

  • Lighting design and installation.

  • Ventilation design & installation.

  • Heating installation.

  • Plumbing installation.

  • Drainage installation.

  • Solar power installation.

  • Fire detection installation.

  • CCTV & security installation.

  • Plant room design & installation.

  • Design and implementation of Building Management System (BMS)

Hythe Mills.jpg

Hythe Mills - Hawkins Road - Colchester

A new accommodation block housing 229 beds, as well as studio accommodation, cluster kitchens and communal areas.

Project duration:

Project Value: £3 Million

As the main M&E contractor on this project, Eurolec Services was responsible for:

  • M&E Design, calculations and construction drawings.

  • Small Power installation

  • Lighting design and installation

  • Ventilation design & installation

  • Heating installation

  • Drainage installation

  • Solar power installation

  • Fire detection installation.

  • Data Installation.

  • CCTV & security installation

  • Plant room design & installation.

  • Design and implementation of Building Management System (BMS)

Beech House.jpg
Beech House 
Beech house - London Road - Oxford
Accommodation block housing 167 rooms

As the M&E contractor on this project, Eurolec was responsible for the design and installation of all lighting, small power, Drainage, Fire detection, Ventilation, Security and CCTV, Solar Power, Door Access, Heating and design in implementation of the BMS system.
Hammermsmith.jpg
Hammersmith Palais

Hammersmith Palais - Shepherds Bush Road - London

A new accommodation block housing 418 rooms, as well as studio accommodation, cluster kitchens and communal areas.

As the M&E contractor on this project, Eurolec was responsible for the design and installation of all lighting, small power, Drainage, Fire detection, Ventilation, Security and CCTV, Solar Power, Door Access, Heating and design in implementation of the BMS system.

Stapleton House
Stapleton House - London
A new accommodation block housing 762 rooms, as well as studio accommodation, cluster kitchens and communal areas.

 

Project duration: Months

Project Value: £7 Million

As the main M&E contractor on this project, Eurolec Services was responsible for:

  • M&E Design, calculations and construction drawings.

  • Small Power installation.

  • Lighting design and installation.

  • Ventilation design & installation.

  • Heating installation.

  • Plumbing installation.

  • Drainage installation.

  • Solar power installation.

  • Fire detection installation.

  • Data installation.

  • CCTV & security installation

  • Plant room design & installation.

  • Design and implementation of Building Management System (BMS)

Ravenscourt.jpg
Ravenscourt House

Ravenscourt House - Paddenswicke Road - London

The development consisted of three interconnecting buildings, housing 234 accommodation units, multiple communal recreational areas, laundry room, gym and a bike store.

 

Project duration: 12Months

Project Value: £7 Million

As the M&E contractor on this project Eurolec were responsible for:

  • M&E Design, calculations and construction drawings.

  • Small Power installation.

  • Lighting design and installation.

  • Ventilation design & installation.

  • Heating installation.

  • Plumbing installation.

  • Drainage installation.

  • Solar power installation.

  • Fire detection installation.

  • Data installation.

  • CCTV & security installation.

  • Lightning protection.

  • Plant room design & installation.

  • Design and implementation of Building Management System (BMS)