Student Accommodation
The Bridge Guildford
The Bridge - Guildford
A 95 Bedroom student accommodation building, installed in a repurposed existing building, previous designed as a hotel.
Project duration:
Project Value: £1 Million
As the main M&E contractor on this project Eurolec was responsible for:
-
M&E design, calculations and construction drawings.
-
Small Power Installation.
-
Lighting design & installation.
-
Fire detection installation.
-
Drainage Installation.
-
Ventilation design & installation
-
Security and CCTV installation.
-
Heating installation.
-
Design and installation of new commercial boiler and pump set.
-
Updating and renovating the building management system (BMS).
Magdalen Street
Magdalen Street - Colchester
A new accommodation block housing 250 study rooms over 3 blocks, as well as studio accommodation, cluster kitchens and communal areas.
Project duration:
Project Value: £3 Million
As the main M&E contractor on this project, Eurolec Services was responsible for:
-
M&E Design, calculations and construction drawings.
-
Small Power installation.
-
Lighting design and installation.
-
Ventilation design & installation.
-
Heating installation.
-
Plumbing installation.
-
Drainage installation.
-
Solar power installation.
-
Fire detection installation.
-
CCTV & security installation.
-
Plant room design & installation.
-
Design and implementation of Building Management System (BMS)
Hythe Mills - Hawkins Road - Colchester
A new accommodation block housing 229 beds, as well as studio accommodation, cluster kitchens and communal areas.
Project duration:
Project Value: £3 Million
As the main M&E contractor on this project, Eurolec Services was responsible for:
-
M&E Design, calculations and construction drawings.
-
Small Power installation
-
Lighting design and installation
-
Ventilation design & installation
-
Heating installation
-
Drainage installation
-
Solar power installation
-
Fire detection installation.
-
Data Installation.
-
CCTV & security installation
-
Plant room design & installation.
-
Design and implementation of Building Management System (BMS)
Beech House
Beech house - London Road - Oxford
Accommodation block housing 167 rooms
As the M&E contractor on this project, Eurolec was responsible for the design and installation of all lighting, small power, Drainage, Fire detection, Ventilation, Security and CCTV, Solar Power, Door Access, Heating and design in implementation of the BMS system.
Hammersmith Palais
Hammersmith Palais - Shepherds Bush Road - London
A new accommodation block housing 418 rooms, as well as studio accommodation, cluster kitchens and communal areas.
As the M&E contractor on this project, Eurolec was responsible for the design and installation of all lighting, small power, Drainage, Fire detection, Ventilation, Security and CCTV, Solar Power, Door Access, Heating and design in implementation of the BMS system.
Stapleton House
Stapleton House - London
A new accommodation block housing 762 rooms, as well as studio accommodation, cluster kitchens and communal areas.
Project duration: Months
Project Value: £7 Million
As the main M&E contractor on this project, Eurolec Services was responsible for:
-
M&E Design, calculations and construction drawings.
-
Small Power installation.
-
Lighting design and installation.
-
Ventilation design & installation.
-
Heating installation.
-
Plumbing installation.
-
Drainage installation.
-
Solar power installation.
-
Fire detection installation.
-
Data installation.
-
CCTV & security installation
-
Plant room design & installation.
-
Design and implementation of Building Management System (BMS)
Ravenscourt House
Ravenscourt House - Paddenswicke Road - London
The development consisted of three interconnecting buildings, housing 234 accommodation units, multiple communal recreational areas, laundry room, gym and a bike store.
Project duration: 12Months
Project Value: £7 Million
As the M&E contractor on this project Eurolec were responsible for:
-
M&E Design, calculations and construction drawings.
-
Small Power installation.
-
Lighting design and installation.
-
Ventilation design & installation.
-
Heating installation.
-
Plumbing installation.
-
Drainage installation.
-
Solar power installation.
-
Fire detection installation.
-
Data installation.
-
CCTV & security installation.
-
Lightning protection.
-
Plant room design & installation.
-
Design and implementation of Building Management System (BMS)